What’s Happening at Dutton’s Hill?

There’s been welcome relief for long-suffering Ruddington drivers and bus passengers this week after the imposition of temporary traffic lights at a notorious traffic bottleneck was postponed. As RUDDINGTON.info previously reported, following a number of gas leaks in recent years, Cadent Gas needs to carry out substantial maintenance on Wilford Road to replace the troublesome old iron gas main under ‘Dutton’s Hill’ (pictured top) with a “more durable” plastic pipe. This was due to happen between 16th October and 13th November 2023, therefore would have been going on at the same time as junction layout improvements…

Read More

Council Says Sorry for Traffic Delays & Disruption

The authority responsible for the major crossroads improvement work in Ruddington, which is set to continue into next year, is apologising to drivers who have complained about the unacceptable hold-ups caused by the current 4-way temporary traffic lights there. Nottinghamshire County Council (NCC) says it’s sorry to hear about those experiencing significant disruption and delay due to the roadworks currently taking place at the junction of the A60 Loughborough Road, Kirk Lane and Flawforth Lane. These works, to add extra turning lanes there, started in July, and have been causing peak time problems…

Read More

Eight Day Road Closure Warning

As predicted, the patience of Ruddington’s long-suffering motorists and public transport users has been tested yet again in the past few weeks. The considerably overdue junction layout improvements at the Kirk Lane/Loughborough Road/Flawforth Lane traffic lights are now fully underway and causing major peak-time hold-ups, with buses often being re-routed as a result*. These works, to add extra turning lanes there, started in July, with preparatory work by National Grid. The package of agreed improvements is now continuing with water main pipe replacement work by Severn Trent starting last month and scheduled to continue until Friday 19th January 2024, with…

Read More

Further Disruptive Ruddington Roadworks Announced

The patience of Ruddington’s long-suffering motorists is to be tested yet again between now and next Easter with a raft of different highway works taking place in our village. The most significant ones, liable to cause the biggest delays, are associated with the long-awaited junction layout improvements at the Kirk Lane/Loughborough Road/Flawforth Lane traffic lights*. These works to add extra turning lanes there started in July, with preparatory work by National Grid. The package of agreed improvements is now continuing – as all the different parties undertake their respective tasks. Although VIA East Midlands says…

Read More

Ruddington’s Summer Roadworks

Whilst our schools are out for the big holiday it’s hoped less traffic will mean fewer delays for Ruddington’s long-suffering motorists. However, there are some scheduled roadworks going on which will inevitably still cause inconvenience and longer journey times. First up, St John’s Road (pictured above) – a popular Ruddington shortcut – is closed to traffic from July 24th to 28th for National Grid work (as shown below), therefore motorists from Wilford Road will need to travel via the village centre to get into the estate or out onto Loughborough Road, and vice-versa.*…

Read More

Major Ruddington Junction Work Begins

Long-awaited highway improvements to alleviate the daily traffic queues at an increasingly busy village crossroads are starting this weekend – and will take around five months to complete. As previously reported, local frustrations have been mounting about peak-time tailbacks at the Kirk Lane/Loughborough Road/Flawforth Lane traffic lights in Ruddington. It’s as hundreds of families continue to move into four major new housing developments here (approved over three years’ ago as part of the Rushcliffe Borough Council (RBC) ‘Local Plan Part Two’) before the mandated improvement works to add extra turning lanes…

Read More

Start Date for Major Junction Work Revealed

Long-awaited highway improvements to alleviate the daily traffic queues at an increasingly busy Ruddington crossroads are scheduled to begin next month. As previously reported, local frustrations have been mounting about peak-time tailbacks at the Kirk Lane/Loughborough Road/Flawforth Lane traffic lights. It’s as hundreds of families continue to move into Ruddington’s four major new housing developments (approved over three years’ ago as part of the Rushcliffe Borough Council (RBC) ‘Local Plan Part Two’) before the mandated improvement works to add extra turning lanes at this critical junction have been carried out. RUDDINGTON.info…

Read More

Ruddington’s June Roadworks

As previously reported, Ruddington’s motorists are already facing longer and longer delays at the Loughborough Road/Kirk Lane/Flawforth Lane traffic lights caused by increased traffic volumes unmitigated by delayed junction improvement work there. Now we’re also being warned about additional hold-ups and disruption this summer due to roadworks scheduled along Loughborough Road and elsewhere in our village – even before this long overdue junction work finally begins. In June 2023 alone, there’s a week of water pipe renewals on the A60, five days of gas work by The Green and a weekend of…

Read More

More Emergency Roadworks!

Motorists who travel to and from Ruddington via Clifton have found themselves delayed again today (Monday 6th March 2023) – after Severn Trent were called in to fix a leaking water valve on Clifton Road near the junction with Old Station Drive. Drivers are advised these two-way temporary traffic lights are likely to remain in place until this Wednesday 8th – by which time it’s hoped the necessary repair or replacement will be completed. It comes shortly after a gas leak outside Hilltop Cottage on Clifton Lane which also saw 24-hour two-way temporary traffic…

Read More

Further Raft of Ruddington Roadworks

Motorists who usually use Packman Drive to get in and out of Ruddington are being advised to use an alternative route for the next few days. From Tuesday 21st to Friday 24th February a new water connection by Severn Trent will mean 24-hour three-way traffic signals in use on Packman Drive at its junction with Ling Crescent. A gas leak outside Hilltop Cottage on Clifton Lane means 24-hour two-way temporary traffic lights are also in use there – and will remain in place until repairs are completed. Due to difficulties encountered by Cadent Gas, the estimated end…

Read More